Views: 0 Author: Site Editor Publish Time: 2024-05-29 Origin: Site
Belt conveyor has simple structure, strong conveying capacity, low cost and wide application. When purchasing, it needs to be inspected after routine installation, and put into production after passing the inspection, to better use the equipment.
1. After the test run is continuously run for 24 hours, all technical indicators meet the design requirements or meet the needs of production, and the conveying equipment meets the perfect standard. The inspection and maintenance records are complete and accurate, and the acceptance procedures are handled in accordance with regulations.
2. Daily maintenance of belt conveyor requires regular inspections and corresponding records:
It is strictly forbidden to start the belt conveyor with load. Before operation, the material on the belt must be checked and removed;
Check the transmission system and timely oil the lubrication parts such as reducers and bearings;
Check the vibration and temperature of the accessory bearings;
Check whether the belt is running off, slipping, and the joints are loose. If necessary, adjustments and repairs are required;
Check whether the rollers and rollers rotate flexibly;
Check whether the frame and various connection parts are damaged or loose.
Strict acceptance can better guarantee the quality of the belt conveyor. Therefore, relevant staff must strictly follow the specifications so that the equipment can give full play to its excellent performance and be better put into production.